- 15:5715:57, 15 May 2024 diff hist 0 Actuator Frame 4PV Creation No edit summary current
14 May 2024
- 18:0618:06, 14 May 2024 diff hist +603 Actuator Frame Bearing Blank Creation new method current Tag: Visual edit
- 17:4317:43, 14 May 2024 diff hist +58 CEGS Creation →Meters - Preliminary Settings: Added nominal values for 30 PSI sensors current
- 17:2217:22, 14 May 2024 diff hist +108 CEGS Creation →Integration: Edited the Gas Supply Tests section with more specific instructions for the Test() function
- 16:1316:13, 14 May 2024 diff hist −402 GR TC Tip Blanked the page current Tag: Blanking
- 16:1316:13, 14 May 2024 diff hist +419 N GR TC Tip Creation Created page with "* Cut a blank out of SS304 tube 1/8 x 035 seamless that is ~.540 * Face part to (.500-.525) * Chamfer both faces * Use .065 bit to drill 3/16 into the part * Chamfer by using a #00 bit * Turn the wheel on the arm so that the bit is sticking out by less than half an inch * Put the bit deep into the collet * Touch the bit to the part * Tap with a M1.6 x .35 * Clean the part * Crush the back half of the part in a vice" current
10 May 2024
- 12:5812:58, 10 May 2024 diff hist +41 GR TC Tip No edit summary
9 May 2024
- 18:5418:54, 9 May 2024 diff hist +21 GR TC Tip No edit summary
- 18:2818:28, 9 May 2024 diff hist +340 N GR TC Tip Created page with "* Cut a blank that is .550 * Face part (.500-.525) * Use .065 bit to drill 3/16 into the part * Chamfer by using a #00 bit * Turn the wheel on the arm so that the bit is sticking out by less than half an inch * Put the bit deep into the collet * Touch the bit to the part * Tap with a M1.6 x .35 * Crush the back half of the part in a vice"
8 May 2024
- 14:1614:16, 8 May 2024 diff hist +75 CEGS Creation →Removal Procedure
- 14:0414:04, 8 May 2024 diff hist +132 CEGS Creation No edit summary
6 May 2024
- 14:4014:40, 6 May 2024 diff hist +1 CEGS Creation →Cleanup HACS Host Computer / Laptop: spelling
- 12:4412:44, 6 May 2024 diff hist +321 CEGS Creation Added links to the CEGS manual to the start of the procedure
- 12:1412:14, 6 May 2024 diff hist +35 CEGS Creation →Delivery
3 May 2024
- 15:0215:02, 3 May 2024 diff hist +57 Plug Valve 1/4 + Actuator Creation No edit summary current
- 15:0215:02, 3 May 2024 diff hist +57 Plug Valve 1/2 + Actuator Creation No edit summary current
- 15:0015:00, 3 May 2024 diff hist +873 Plug Valve 1/2 + Actuator Creation No edit summary
- 14:5814:58, 3 May 2024 diff hist +18 Plug Valve 1/4 + Actuator Creation No edit summary
- 14:5714:57, 3 May 2024 diff hist +1,659 N Plug Valve 1/4 + Actuator Creation Created page with " =Insert the valve stem into the coupling= #Choose the plug's orientation in the coupling according to the valve's intended location in the plumbing Notes: #The actuator is pre-programmed to the closed position. #Usually, the servo connector pins should point downstream, and the plug's port-sealing O-ring should face upstream. #Thus, the port O-ring usually faces away from the servo pins. Exceptions occur when the downstream chamber volume must be minimized. #Align the h..."
- 14:4914:49, 3 May 2024 diff hist −167 CCQ Furnace Creation No edit summary current
- 14:4214:42, 3 May 2024 diff hist +43 Furnace Installation No edit summary current
- 14:2214:22, 3 May 2024 diff hist +397 Furnace Installation No edit summary
- 14:1214:12, 3 May 2024 diff hist −71 CCQ Furnace Creation No edit summary
- 14:0314:03, 3 May 2024 diff hist +27 Furnace Installation No edit summary
2 May 2024
- 15:1815:18, 2 May 2024 diff hist +153 Actuator Frame 4PV Creation No edit summary
- 15:1415:14, 2 May 2024 diff hist +1 Actuator Frame 4PV Creation No edit summary
- 12:4912:49, 2 May 2024 diff hist +12 Actuator Frame 4PV Creation No edit summary
1 May 2024
- 20:4320:43, 1 May 2024 diff hist +33 Actuator Frame 4PV Creation No edit summary
- 20:0120:01, 1 May 2024 diff hist +260 Actuator Frame 4PV Creation No edit summary
26 April 2024
- 15:4515:45, 26 April 2024 diff hist −2 CEGS Creation →VTC Cold Operation
- 15:4415:44, 26 April 2024 diff hist +7 CEGS Creation →VTC Cold Operation
25 April 2024
- 17:0117:01, 25 April 2024 diff hist +1,038 N O-ring bakeout Creation Created page with "O-ring bakeout Summary: Bake Viton O-rings at 150 °C under vacuum for 4 hours. Distribute the O-rings evenly in a clean borosilicate or stainless steel vessel. A dish or pan is best. A beaker may be used for smaller quantities of O-rings, but spreading the O-rings over a larger surface area is preferable. Place the O-rings into the vacuum oven and evacuate the chamber to < 7 Torr. If the bakeout vacuum system is equipped with a turbo pump and flow-through cold trap,..." current
- 16:0516:05, 25 April 2024 diff hist +311 Phase Separator Rod Creation No edit summary current
- 15:4015:40, 25 April 2024 diff hist −39 Phase Separator Rod Creation No edit summary
- 15:3015:30, 25 April 2024 diff hist +38 Phase Separator Rod Creation No edit summary
23 April 2024
- 17:2817:28, 23 April 2024 diff hist +440 FTC LN Line Creation No edit summary current
- 17:2217:22, 23 April 2024 diff hist −9 MFV Actuator Adapter Creation No edit summary current
- 17:2117:21, 23 April 2024 diff hist +7 MFV Actuator Adapter Creation No edit summary
- 17:2117:21, 23 April 2024 diff hist +309 N TC Staple Creation Created page with "# Cut SS304 wire 0.025 spring back to 1.625 inches. # Grab the center of the cut wire with pliers. # Bend the wire down on both sides of the pliers. #* If the wire was centered correctly then both legs of the wire will be the same length. #* Check model to make sure that the part is made to the correct size." current
- 17:1717:17, 23 April 2024 diff hist +304 N MFV Actuator Adapter Creation Created page with "# Cut blank to .504 # Face part on the lathe # Use center bit to put a mark on part # Use .182 bit to create hole at center # Chamfer the inside edge of both sides of the hole # Ream the part with a 3/16 undersized bit # Grind .015 off the side of the part # Drill a .136 hole # Tap that hole with 8-36"
- 17:1317:13, 23 April 2024 diff hist +272 N Phase Separator Rod Creation Created page with "# Cut rod to 14.084 # Use swagelok bender # Mark the part 6.071 from the end #* We will call this section of the rod leg a # Place leg a in the bender and line up the mark on the rod with the 0 mark on the bender # Make a 90 degree bend # Check to make sure it is square"
- 13:4513:45, 23 April 2024 diff hist +30 Mains detector No edit summary current
- 13:4213:42, 23 April 2024 diff hist 0 N CEGS Nameplate Creation Created blank page Tag: Visual edit
19 April 2024
- 16:1116:11, 19 April 2024 diff hist −151 FTC Air Line Creation No edit summary current
18 April 2024
- 16:5816:58, 18 April 2024 diff hist +172 N Servo Spacer-Bearing Creation Created page with "# Place a .144 bit in the mill. # Turn the mill on then push the spacer-bearing onto the drill bit. #* MAKE SURE TO NOT TOUCH THE BIT WITH HANDS OR ANY LOOSE CLOTHING/HAIR." current
15 April 2024
- 16:5516:55, 15 April 2024 diff hist −2 Plug Valve SS 1/4 Modified Creation No edit summary current
- 16:5516:55, 15 April 2024 diff hist −1 Plug Valve SS 1/4 Modified Creation No edit summary
11 April 2024
- 15:1215:12, 11 April 2024 diff hist +341 Phase Separator Pad Creation Added procedure to use the manual mill to create the hole current
10 April 2024
- 19:4519:45, 10 April 2024 diff hist +204 Plug Valve SS 1/4 Modified Creation No edit summary