Recent changes
Track the most recent changes to the wiki on this page.
List of abbreviations:
- N
- This edit created a new page (also see list of new pages)
- m
- This is a minor edit
- b
- This edit was performed by a bot
- (±123)
- The page size changed by this number of bytes
15 May 2024
15:57 | Actuator Frame 4PV Creation diffhist 0 73.24.216.92 talk |
14 May 2024
18:06 | Actuator Frame Bearing Blank Creation diffhist +603 73.24.216.92 talk (new method) |
|
17:43 | CEGS Creation 2 changes history +166 [73.24.216.92 (2×)] | |||
|
17:43 (cur | prev) +58 73.24.216.92 talk (→Meters - Preliminary Settings: Added nominal values for 30 PSI sensors) | ||||
|
17:22 (cur | prev) +108 73.24.216.92 talk (→Integration: Edited the Gas Supply Tests section with more specific instructions for the Test() function) |
16:13 | GR TC Tip diffhist −402 73.24.216.92 talk (Blanked the page) |
N 16:13 | GR TC Tip Creation diffhist +419 73.24.216.92 talk (Created page with "* Cut a blank out of SS304 tube 1/8 x 035 seamless that is ~.540 * Face part to (.500-.525) * Chamfer both faces * Use .065 bit to drill 3/16 into the part * Chamfer by using a #00 bit * Turn the wheel on the arm so that the bit is sticking out by less than half an inch * Put the bit deep into the collet * Touch the bit to the part * Tap with a M1.6 x .35 * Clean the part * Crush the back half of the part in a vice") |
10 May 2024
12:58 | GR TC Tip diffhist +41 73.24.216.92 talk |
9 May 2024
|
N 18:54 | GR TC Tip 2 changes history +361 [73.24.216.92 (2×)] | |||
|
18:54 (cur | prev) +21 73.24.216.92 talk | ||||
N |
|
18:28 (cur | prev) +340 73.24.216.92 talk (Created page with "* Cut a blank that is .550 * Face part (.500-.525) * Use .065 bit to drill 3/16 into the part * Chamfer by using a #00 bit * Turn the wheel on the arm so that the bit is sticking out by less than half an inch * Put the bit deep into the collet * Touch the bit to the part * Tap with a M1.6 x .35 * Crush the back half of the part in a vice") |
8 May 2024
|
14:16 | CEGS Creation 2 changes history +207 [73.24.216.92 (2×)] | |||
|
14:16 (cur | prev) +75 73.24.216.92 talk (→Removal Procedure) | ||||
|
14:04 (cur | prev) +132 73.24.216.92 talk |
6 May 2024
3 May 2024
|
N 15:02 | Plug Valve 1/4 + Actuator Creation 3 changes history +1,734 [73.24.216.92 (3×)] | |||
|
15:02 (cur | prev) +57 73.24.216.92 talk | ||||
|
14:58 (cur | prev) +18 73.24.216.92 talk | ||||
N |
|
14:57 (cur | prev) +1,659 73.24.216.92 talk (Created page with " =Insert the valve stem into the coupling= #Choose the plug's orientation in the coupling according to the valve's intended location in the plumbing Notes: #The actuator is pre-programmed to the closed position. #Usually, the servo connector pins should point downstream, and the plug's port-sealing O-ring should face upstream. #Thus, the port O-ring usually faces away from the servo pins. Exceptions occur when the downstream chamber volume must be minimized. #Align the h...") |
|
15:02 | Plug Valve 1/2 + Actuator Creation 2 changes history +930 [73.24.216.92 (2×)] | |||
|
15:02 (cur | prev) +57 73.24.216.92 talk | ||||
|
15:00 (cur | prev) +873 73.24.216.92 talk |
|
14:49 | CCQ Furnace Creation 2 changes history −238 [73.24.216.92 (2×)] | |||
|
14:49 (cur | prev) −167 73.24.216.92 talk | ||||
|
14:12 (cur | prev) −71 73.24.216.92 talk |
|
14:42 | Furnace Installation 3 changes history +467 [73.24.216.92 (3×)] | |||
|
14:42 (cur | prev) +43 73.24.216.92 talk | ||||
|
14:22 (cur | prev) +397 73.24.216.92 talk | ||||
|
14:03 (cur | prev) +27 73.24.216.92 talk |
2 May 2024
|
15:18 | Actuator Frame 4PV Creation 3 changes history +166 [73.24.216.92 (3×)] | |||
|
15:18 (cur | prev) +153 73.24.216.92 talk | ||||
|
15:14 (cur | prev) +1 73.24.216.92 talk | ||||
|
12:49 (cur | prev) +12 73.24.216.92 talk |
1 May 2024
|
20:43 | Actuator Frame 4PV Creation 2 changes history +293 [73.24.216.92 (2×)] | |||
|
20:43 (cur | prev) +33 73.24.216.92 talk | ||||
|
20:01 (cur | prev) +260 73.24.216.92 talk |
26 April 2024
|
15:45 | CEGS Creation 2 changes history +5 [73.24.216.92 (2×)] | |||
|
15:45 (cur | prev) −2 73.24.216.92 talk (→VTC Cold Operation) | ||||
|
15:44 (cur | prev) +7 73.24.216.92 talk (→VTC Cold Operation) |
25 April 2024
|
19:38 | CEGS Creation 2 changes history +356 [AddisonSterner (2×)] | |||
|
19:38 (cur | prev) −40 AddisonSterner talk contribs (Removed the 'Exercise all LN valves' part of the LN Manifold section, since it is an obsolete step) | ||||
|
19:35 (cur | prev) +396 AddisonSterner talk contribs (Added new procedure for LN valve flow rates, and edited the LN closed valve position to be +820 rather than +1000 from open position.) |
N 17:01 | O-ring bakeout Creation diffhist +1,038 73.24.216.92 talk (Created page with "O-ring bakeout Summary: Bake Viton O-rings at 150 °C under vacuum for 4 hours. Distribute the O-rings evenly in a clean borosilicate or stainless steel vessel. A dish or pan is best. A beaker may be used for smaller quantities of O-rings, but spreading the O-rings over a larger surface area is preferable. Place the O-rings into the vacuum oven and evacuate the chamber to < 7 Torr. If the bakeout vacuum system is equipped with a turbo pump and flow-through cold trap,...") |
|
16:05 | Phase Separator Rod Creation 3 changes history +310 [73.24.216.92 (3×)] | |||
|
16:05 (cur | prev) +311 73.24.216.92 talk | ||||
|
15:40 (cur | prev) −39 73.24.216.92 talk | ||||
|
15:30 (cur | prev) +38 73.24.216.92 talk |