CCQ Furnace Creation: Difference between revisions

From Aeon HACS Wiki
(Inserted furnace installation link)
No edit summary
Line 9: Line 9:
#: CCQ: clip leads approximately 57 mm from bend; 12 beads per lead.
#: CCQ: clip leads approximately 57 mm from bend; 12 beads per lead.
# Refer to steps 2 and 3 in [[CFF Preparation|CFF preparation]]
# Refer to steps 2 and 3 in [[CFF Preparation|CFF preparation]]
# CCQ furnaces only: Drill through the potting using a 1/2 inch diamond core bit.
# CCQ furnaces only:
#: Milling setup for coring potted furnaces (1)
## Clear the center hole of the furnace by running a 1/2 threaded rod through the hole.
#: Milling setup for coring potted furnaces (2)
# Refer to step 6 through 10 in [[CFF Preparation|CFF preparation]]
# Refer to step 6 through 10 in [[CFF Preparation|CFF preparation]]
#: CCQ: About 4 grams of potting cement
#: CCQ: About 4 grams of potting cement
# If the furnace does not allow the inlet port furnace aligner tool (TL-IP-FA) to freely pass in and out of the furnace, use a diamond coring tool to clear the hole. Use the mill or your fingers to spin the bit and gently remove the material causing the bind. The furnace aligner should freely pass through the hole unassisted.
# If the furnace does not allow the inlet port furnace aligner tool (TL-IP-FA) to freely pass in and out of the furnace, use a diamond coring tool to clear the hole. Use the mill or your fingers to spin the bit and gently remove the material causing the bind. The furnace aligner should freely pass through the hole unassisted.

Revision as of 14:12, 3 May 2024

    3D Model    About this item    Product info

General directions for all furnaces can be located here. Use these directions when instructed below.

  1. Make a sharp 90-degree bend in the leads 1/16 inch above the back surface, so the leads point away from the center of the furnace.
  2. Make a second bend so the leads run along the cylinder about 1/16 inch above the surface.
  3. Clip the leads to length (use furnace lead sizer, TL-FLS), insulate with fish-spine beads, and terminate each lead with a Molex male pin.
    CCQ: clip leads approximately 57 mm from bend; 12 beads per lead.
  4. Refer to steps 2 and 3 in CFF preparation
  5. CCQ furnaces only:
    1. Clear the center hole of the furnace by running a 1/2 threaded rod through the hole.
  6. Refer to step 6 through 10 in CFF preparation
    CCQ: About 4 grams of potting cement
  7. If the furnace does not allow the inlet port furnace aligner tool (TL-IP-FA) to freely pass in and out of the furnace, use a diamond coring tool to clear the hole. Use the mill or your fingers to spin the bit and gently remove the material causing the bind. The furnace aligner should freely pass through the hole unassisted.