CCQ Furnace Creation

From Aeon HACS Wiki
Revision as of 14:49, 3 May 2024 by 73.24.216.92 (talk)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
    3D Model    About this item    Product info

General directions for all furnaces can be located here. Use these directions when instructed below.

  1. Make a sharp 90-degree bend in the leads 1/16 inch above the back surface, so the leads point away from the center of the furnace.
  2. Make a second bend so the leads run along the cylinder about 1/16 inch above the surface.
  3. Clip the leads to length (use furnace lead sizer, TL-FLS), insulate with fish-spine beads, and terminate each lead with a Molex male pin.
    CCQ: clip leads approximately 57 mm from bend; 12 beads per lead.
  4. Refer to steps 2 and 3 in CFF preparation
  5. Refer to step 6 through 10 in CFF preparation
    CCQ: About 4 grams of potting cement
  6. If the furnace does not allow the inlet port furnace aligner tool (TL-IP-FA) to freely pass in and out of the furnace, 1/2" threaded rod. Spin the bit and gently remove the material causing the bind. The furnace aligner should freely pass through the hole unassisted.