Inline LN Phase Separator Creation
- Gather materials from BOM.
Shroud Assembly[edit | edit source]
- You should do this step when you have the LN retainer available.
- Insert the phase separator tube into the phase separator shroud.
- There should be about 0.4 inches between the top of the tube, and the top of the shroud that clamps to the tube.
- Insert this assembly into the tubing retainer.
- Put an e-clip a half inch down from the top phase separator tube using the e-clip tool in the tool bin.
- The e-clip should be holding both parts securely and keeping the phase separator in place on the tubing retainer.
- Do this for all phase separator shrouds/tubes.
Funnel Assembly[edit | edit source]
- Attach the funnel to the LN line tubing that connects to the GR FTC.
- Line the LN line tubing to be level with where the smaller opening of the funnel starts to widen outwards.
- Have the LN line tubing and funnels in place, and then set the retainer down in place in the LN manifold, aligning each shroud to fit over the funnel.