Inline LN Phase Separator Creation

From Aeon HACS Wiki
    3D Model    About this item    Product info

  1. Gather materials from BOM.

Shroud Assembly[edit | edit source]

  1. You should do this step when you have the LN retainer available.
  2. Insert the phase separator tube into the phase separator shroud.
    There should be about 0.4 inches between the top of the tube, and the top of the shroud that clamps to the tube.
  3. Insert this assembly into the tubing retainer.
  4. Put an e-clip a half inch down from the top phase separator tube using the e-clip tool in the tool bin.
    The e-clip should be holding both parts securely and keeping the phase separator in place on the tubing retainer.
  5. Do this for all phase separator shrouds/tubes.

Funnel Assembly[edit | edit source]

  1. Attach the funnel to the LN line tubing that connects to the GR FTC.
  2. Line the LN line tubing to be level with where the smaller opening of the funnel starts to widen outwards.
  3. Have the LN line tubing and funnels in place, and then set the retainer down in place in the LN manifold, aligning each shroud to fit over the funnel.