User contributions for Gilchrist.gbele
A user with 21 edits. Account created on 30 May 2024.
4 September 2024
- 15:4515:45, 4 September 2024 diff hist −16 Solenoid Valve Stack Creation No edit summary current
- 13:1613:16, 4 September 2024 diff hist −99 Air Manifold 9 Port Creation No edit summary current
- 13:1513:15, 4 September 2024 diff hist −100 Air Manifold 11 Port Creation No edit summary current
27 August 2024
- 16:4916:49, 27 August 2024 diff hist 0 GR Swing Stop Creation No edit summary current
- 16:4916:49, 27 August 2024 diff hist 0 FTC Bank Bar Creation No edit summary current
- 16:4216:42, 27 August 2024 diff hist −870 FTC Bank Bar Creation →Instructions
13 August 2024
- 17:2017:20, 13 August 2024 diff hist −194 Control Box Wiring Creation No edit summary current
- 17:1817:18, 13 August 2024 diff hist 0 Control Box Wiring Creation No edit summary
- 16:5316:53, 13 August 2024 diff hist −354 Control Box Wiring Creation No edit summary
- 15:3115:31, 13 August 2024 diff hist −117 Control Box Wiring Creation No edit summary
- 15:2615:26, 13 August 2024 diff hist +246 Control Box Wiring Creation No edit summary
12 August 2024
- 16:4116:41, 12 August 2024 diff hist +1 Grounding Kit Creation →Terminals current
- 15:1515:15, 12 August 2024 diff hist −3 Control Box Wiring Creation No edit summary
- 14:4914:49, 12 August 2024 diff hist −1,118 Mains detector No edit summary current
- 14:2814:28, 12 August 2024 diff hist +1,116 N Mains Detector Creation Created page with "# If using a 6ft usb A-B cable, cut the cable at the usb B side. # Remove about 2" of cable insulation. #* Using an x-acto blade mark a ring around the cable at the length to be removed. #** Typically a shallow mark here is desired - the goal is to weaken the insulation, not slice through it completely potentially damaging the wires inside. #* Bend the cable at this mark and use the blade to gently finish separating any still connected insulation. #* Slide the now separa..."
9 August 2024
- 15:0215:02, 9 August 2024 diff hist +2 Control Box Wiring Creation No edit summary
25 July 2024
- 14:2814:28, 25 July 2024 diff hist +395 N Servo Bottom Serial Creation Created page with " # Insert the servo bottom block (TL-SBB) into the cover. # Use the cnc mill to mill the servo bottom # Use the program named "rs232 servo bottom" # Mark pin 1: # Mill a .04 OD x 0.015 deep, 0.125" to the side of pin 1, aligned vertically with the row of pin centers. # Trim the ridges of the cover to provide clearance for the DSMC PCB along the sides and on the end beside the connector cutout" current
- 14:2514:25, 25 July 2024 diff hist +91 N Servo Bottom CPW Creation Created page with "# Use the MV35 program for the servo bottom CPW # Use a .04 bit to mark near the ground pin" current
17 July 2024
- 15:4915:49, 17 July 2024 diff hist +470 N 3D printing, filament Created page with "=Changing the filament= # select unload filament # select the material currently loaded # wait for the printer to heat up # press the knob then pull the filament out # if switching to a different material then press x after this ## after selecting autoload select the material that is going to be loaded # auto load # load the new filament # make sure the color is correct # (if the type of filament is changed then there settings on the super slicer need to be changed)" current
12 July 2024
- 15:3015:30, 12 July 2024 diff hist −42 Grounding Kit Creation No edit summary
30 May 2024
- 12:4912:49, 30 May 2024 diff hist +656 CEGS Creation →CEGS Assembly Sequence