Heater Controller Stack Base Creation
Instructions
- Prepare the components
- Ensure all components are available
- Mount the principal CCA heater controller 6 channel v.C
- Place the CCA heater controller 6 channel v.C on a clean, flat workspace
- Ensure the mounting holes are aligned and ready for the next step
- Attach the CCA stack power boards
- Take the first CCA stack power board and align it on one side of the heater controller 6 channel v.C
- Ensure that the connectors and mounting holes are properly aligned
- Secure the CCA stack power board in place using the appropriate fasteners
- Repeat this process for the second CCA stack power board on the opposite side of the heater controller 6 channel v.C
- Install