Heater Controller Stack Base Creation: Difference between revisions

From Aeon HACS Wiki
No edit summary
No edit summary
 
Line 3: Line 3:
|about=Heater_Controller_Stack_Base
|about=Heater_Controller_Stack_Base
|product=heater+controller+stack+base}}
|product=heater+controller+stack+base}}
[[File:Heater controller stack base exploded view.png|alt=Heater controller stack base exploded view|thumb|Heater controller stack base exploded view]]


== Instructions ==
== Instructions ==
 
[[File:Heater controller stack base exploded view.png|alt=Heater controller stack base exploded view|thumb|Heater controller stack base exploded]]
# Prepare the components
# Prepare the components
#: Ensure all components are available
#: Ensure all components are available

Latest revision as of 14:26, 21 August 2024


Instructions

Heater controller stack base exploded view
Heater controller stack base exploded
  1. Prepare the components
    Ensure all components are available
  2. Mount the principal CCA heater controller 6 channel v.C
    Place the CCA heater controller 6 channel v.C on a clean, flat workspace
    Ensure the mounting holes are aligned and ready for the next step
  3. Attach the CCA stack power boards
    Take the first CCA stack power board and align it on one side of the heater controller 6 channel v.C
    Ensure that the connectors and mounting holes are properly aligned
    Secure the CCA stack power board in place using the appropriate fasteners
    Repeat this process for the second CCA stack power board on the opposite side of the heater controller 6 channel v.C
  4. Install the nylon standoffs
    Locate the four corner mounting holes on the CCA heater controller 6 channel v.C
    Attach the nylon standoffs 4-40 x 1/4 hex x 1/2 to each of the four corners, ensuring they are securely fastened
    These standoffs will provide the necessary spacing and support for the assembly, ensuring proper alignment when installed into the system
  5. Final check
    Verify that all components are securely attached and properly aligned
    Ensure that all connections between the heater controller 6 channel v.C and the CCA stack power boards are tight and functioning correctly