Heater Controller Stack Base Creation: Difference between revisions

From Aeon HACS Wiki
(Created page with "{{Item navbar |model= |about=Heater_Controller_Stack_Base |product=heater+controller+stack+base}} == Instructions == # Prepare the components #: Ensure all components are available # Mount the principal CCA heater controller 6 channel v.C #: Place the CCA heater controller 6 channel v.C on a clean, flat workspace #: Ensure the mounting holes are aligned and ready for the next step # Attach the CCA stack power boards #: Take the first CCA stack power board and align it...")
 
No edit summary
Line 16: Line 16:
#: Secure the CCA stack power board in place using the appropriate fasteners
#: Secure the CCA stack power board in place using the appropriate fasteners
#: Repeat this process for the second CCA stack power board on the opposite side of the heater controller 6 channel v.C
#: Repeat this process for the second CCA stack power board on the opposite side of the heater controller 6 channel v.C
# Install
# Install the nylon standoffs
#: Locate the four corner mounting holes on the CCA heater controller 6 channel v.C
#: Attach the nylon standoffs 4-40 x 1/4 hex x 1/2 to each of the four corners, ensuring they are securely fastened
#: These standoffs will provide the necessary spacing and support for the assembly, ensuring proper alignment when installed into the system
# Final check
#: Verify that all components are securely attached and properly aligned
#: Ensure that all connections between the heater controller 6 channel v.C and the CCA stack power boards are tight and functioning correctly

Revision as of 14:13, 21 August 2024


Instructions

  1. Prepare the components
    Ensure all components are available
  2. Mount the principal CCA heater controller 6 channel v.C
    Place the CCA heater controller 6 channel v.C on a clean, flat workspace
    Ensure the mounting holes are aligned and ready for the next step
  3. Attach the CCA stack power boards
    Take the first CCA stack power board and align it on one side of the heater controller 6 channel v.C
    Ensure that the connectors and mounting holes are properly aligned
    Secure the CCA stack power board in place using the appropriate fasteners
    Repeat this process for the second CCA stack power board on the opposite side of the heater controller 6 channel v.C
  4. Install the nylon standoffs
    Locate the four corner mounting holes on the CCA heater controller 6 channel v.C
    Attach the nylon standoffs 4-40 x 1/4 hex x 1/2 to each of the four corners, ensuring they are securely fastened
    These standoffs will provide the necessary spacing and support for the assembly, ensuring proper alignment when installed into the system
  5. Final check
    Verify that all components are securely attached and properly aligned
    Ensure that all connections between the heater controller 6 channel v.C and the CCA stack power boards are tight and functioning correctly